Monday, November 12, 2007

Oooh, Shiny

The fridge and range came and were hauled in today. The water line for the fridge leaked when they hooked that up, so the plumber is going to have to fix that. The outlet works, so it got nice and cool. The range connections still need a little work and they need to install an anti-tip bracket. That might be the last of the big items on the list - still plenty of little things left to do though.




Sink - For Real

The last countertop piece came and was installed today. Then they were able to put the sink in. Garbage disposal and faucet should go in tomorrow.


Camo Dog

Well it was bound to happen sooner or later - a picture of the dog had to make it onto the blog. I'm surprised it has taken this long. Casey was exhausted from all the action and plopped down on the kitchen floor. She's pretty much the same color as the floor so she's quite well camouflaged.

Busy Weekend

Lots and lots got done this weekend - it has been a crazy house. The dishwasher, washer/dryer and microwave got moved back inside.




Some cabinet crown molding also got installed.



More electrical work for the range, miscellaneous outlets and switches.


They also ran the water line for the fridge.


We're also trying find a paint color to match the counter for these plastic grommets.

Thursday, November 8, 2007

Knobs

The cabinet knobs were delivered today. This pyramid shape is a traditional Arts and Crafts design. Solid brass and very hefty.


Countertop Install

Our lovely Silestone countertops were installed today. It's a little hard to to tell from the pics, but the flecks in there pick up the paint color very nicely. Looking good.







Sink - Psych!

Well, it looks like they didn't cut the hole for the sink quite right. The top edge of the sink is supposed to be flush with the counter instead of being set in like it is here. It doesn't look terrible, but its not what we asked for, so we sent it back and decided to make them do it the right way. Shouldn't take too long to get that one piece back.



Wednesday, November 7, 2007

Floor - Part 2

Finished the floor today and added trim along the baseboard. Still need to finish up the transition piece between the family room and the hallway. Also need to shave down the bottom of the bathroom and basement doors so they will close over the new transition pieces. That bottom trim will be painted up to match.





Product List

In case anyone is interested, here are the parts and pieces Eirik (and I) selected. Lots of thorough research went into these selections and we like what we've seen and has been installed so far. Enjoy.
  • Cabinets
    Kraftmaid
    Deveron Cherry Square - Autumn Blush
    Lowes Kentlands - Gaithersburg
  • Cabinet Hardware
    Belwith Keeler
    Kingston - Old English Pewter - Hammered square pyramid - M682
    Lowes Kentlands - Gaithersburg
  • Floor
    Wilsonart
    W3000208 - Urban Slate - Red Label Laminate Tile
    Rug & Carpet Works - Rockville
  • Countertop
    Silestone
    Ivory Coast
    Cabinet Discounters/Counter Intelligence
  • Paint
    Benjamin Moore
    Walls - Camouflage, Trim - Ivory Tusk
    Regal Paint Center - Silver Spring
  • Recessed Lighting
    Lightolier
    1003R 5" diameter/2003R 3 3/4" diameter Non-Insulated Remodeler w/Specular Clear Reflector Trims
    Dominion Electric Supply - Laurel
  • Under-cabinet Lighting
    Kichler
    KIC10579/80/81 Xenon Fixtures (7", 12.25". 21.5" respectively) Hard Wired
    Dominion Electric Supply - Laurel
  • Accent/Task Lighting
    Tech-Lighting
    700FJCBOS - Cabo Pendant Freejack module in Satin Nickel, using Surface Mount Canopy; 700WSCBOS - Cabo Wall Sconce module in Satin Nickel
    Dominion Electric Supply - Laurel
  • Dimmer Switches
    Lutron
    Recessed - Diva Incandescent single pole 600W - DV-600P; Tech Lighting - DivaElectr. Low Voltage, single pole 300 W - DVELV-300P
    Dominion Electric Supply - Laurel
  • Sink
    Houzer
    CTS-2300 - Zero Radius Undermount Single Bowl Stainless Steel w/Bottom Grid and Cutting Board Accessories
    AJ Madison
  • Faucet
    Hansgrohe
    35807801 - Axor Steel Kitchen Faucet
    Everyfaucet.com
  • Refrigerator
    Maytag
    MFC2061KES - Cabinet Depth, Bottom Freezer, French Door, Energy Star
    Bray and Scarff - Rockville
  • Range
    Thermador
    PRD364ELHU - PRO Harmony Dual-Fuel Range w/ 4 burners and gas Grill
    Bray and Scarff - Rockville
  • Hood
    Zephyr
    AK7536AS - Tempest II - 1100CFM internal blower w/ heat lamp kit and 12" duct cover
    Bray and Scarff - Rockville
  • Fireplace Insert
    Kozy Heat
    Jackson XL vented gas insert
    Offenbachers - North Bethesda

Tuesday, November 6, 2007

Floor - Part 1

Luis was here bright and early at 6:30am to start putting down the flooring. The part that's in so far looks awesome. Here is a sample - it's a laminate that's supposed to look like slate. This first picture is the actual color, some of the other photos are reddish.



Just about ready for the fridge.


Raul also came and finished the electric work for the stove.


This part's not quite done yet.



Not a new feature - they just pulled the doors off to get the floor in easier. This one's just hanging out here for a few days.