Friday, October 19, 2007

Inspection

Oh, there's that lynch pin we've been looking for. The electrical inspection was completed and approved today, so the guys can now close up the walls and prep for paint. The base cabinets should be in in a week and we are about two weeks from doing the floor. So appliances should be installed in about two and a half weeks (Eirik is very excited about this bit). After the appliances is the counter top install, sink and faucet and then it's just finishing touches.