Wednesday, October 31, 2007

Fireplace

Chris the gas guy came in yesterday and did some more work, getting most of the fireplace installed. He got up on the roof and slid the air conduit and vent conduit down into the chimney, and then got the gas log unit situated in the fireplace. He just has to button everything up now and get the trim pieces and doors on. We do have to wait until it is inspected before we're allowed to use it though.



The thing in the package is a carbon monoxide detector. You can also see the red gas valve through the crack there. The gauge there is for pressure testing.

These are the old doors and the old grate.


No comments: