Check it out people -- Luis and the guys moved most of the lower cabinets in Friday. He has installed about half of them, but still has to move the ones in that will support the desk surface and attach the rest of them to the wall. That should be done in the next couple of days. Then the guys can come in and measure for the countertop and Luis can start installing the flooring. Eirik also got the sink and faucet and the range hood was delivered.
1 comment:
Looking good! I love the colors.
Post a Comment